Rudston Preparatory School (6)
A two phase 9,700sf addition to a primary private school. Phase 01 joined two existing structures, at the back of the site, providing 4 classrooms and a dining hall. To address significant level changes, an internal transition space was designed, providing much needed service space. Phase 2, although placed on hold, was intended to join the main entrance buildings, providing a place for students to wait during inclement weather. Project designer at WGI International -
Allerton Grange High School (16)
156,000sf high school designated as one of the Leeds Building Schools for the Future [BSF) pilot project that spearheaded a new approach to learning and sustainable design in schools. Equipped with an internet cafe,flexible mixed use spaces and an almost paperless curriculum (student laptop service), the school itself was innovative in it's wide use of natural light, creative smoke and passive cooling strategies. Project lead while with WGI International.